Pool builders en Torrejon de Ardoz

Verified pool builders in Torrejon de Ardoz (Madrid). Construction, renovation and maintenance of swimming pools. Verified professionals across Spain.

5 Companies maximum
24 – 48h Average response time
100% Manually verified companies

Swimming pools en Torrejon de Ardoz

In Torrejon de Ardoz, with over 300 days of sunshine per year, a swimming pool is an investment that increases your property value. Our professionals build concrete, fibreglass, infinity and natural pools.

Swimming pools en Torrejon de Ardoz
Torrejon de Ardoz

Swimming pools en Torrejon de Ardoz — Price guide

Indicative market prices (2026). Final quote depends on scope and materials chosen.

Concrete pool 8×4m
15.750 – 36.750 €
Excavation, shell and finish
Fibreglass pool
8.400 – 18.900 €
Complete installation
Tile renovation
3.150 – 8.400 €
Relining the pool
Annual maintenance
105 – 262 €/mes
Cleaning, chemicals and inspection

Get your quote in 3 steps

01

Tell us about your project

Fill in the form with details of your swimming pools project in Torrejon de Ardoz. It only takes 2 minutes.

02

Receive up to 5 quotes

Verified companies in Torrejon de Ardoz review your project and send detailed proposals within 24-48 hours.

03

Choose and hire

Compare prices, timelines and experience. Choose the company that suits you best. No fees, no obligations.

Start now — it's free

What our
customers say.

★★★★★

"I requested quotes to renovate my bathroom and in less than 24 hours I had 3 companies contacting me. I chose one with an excellent price. Super easy."

MR
María R.
Torremolinos
★★★★★

"I needed a plumber urgently. Got 3 calls within 2 hours and the problem was fixed the same day. No more googling random numbers."

JL
Javier L.
Marbella
★★★★★

"I compared quotes from 3 different companies and saved nearly 30% vs the first price I got on my own."

AP
Ana P.
Málaga

All about swimming pools
in Torrejon de Ardoz.

How much does it cost to build a pool?

A concrete pool of 8×4 metres costs between €15,000 and €35,000. Fibreglass pools are more affordable: €8,000-18,000 installed.

How long does pool construction take?

A concrete pool takes 6-12 weeks. Fibreglass pools are installed in 2-3 weeks. Council permits can add 4-8 additional weeks.

Do I need a licence to build a pool?

Yes. Across Spain, a major works licence is required to build a swimming pool. The licence cost is approximately 4-6% of the construction budget.

Other services in Torrejon de Ardoz

Need swimming pools in Torrejon de Ardoz?

Request quotes from verified companies. Free, no registration and no obligation.

Request free quote